Purpose

Ensure that everything we build traces to a need and everything we need is verified, with the evidence produced by the pipeline rather than assembled by hand.

Rules

  1. REQ-01 Requirements MUST be decomposed through defined levels (stakeholder and system, subsystem, firmware and component). Each requirement is allocated to the next level down, and the allocation is recorded.
  2. REQ-02 A requirement MUST be atomic, unambiguous, feasible, necessary, consistent and verifiable. It MUST state one verification method: test, analysis, inspection or demonstration.
  3. REQ-03 (core) Requirements MUST be stored as text in the repository beside the design, with stable IDs of the form REQ-<AREA>-<nnnn>. IDs are never reused.
  4. REQ-04 Each requirement MUST carry a rationale, a parent, an owner and a status: draft, approved, implemented, verified, retired. Retired requirements are never deleted.
  5. REQ-05 Requirements MUST be baselined at each release by tag. Changes are made by PR, and history is kept in version control.
  6. REQ-06 (core) Requirement IDs MUST be referenced in commit footers, PR descriptions, test names and, where non-obvious, code comments and ADRs.
  7. REQ-07 Every approved requirement MUST be allocated to a design element, implemented and verified. Every test MUST trace to a requirement. Every significant code unit MUST trace to a requirement or an approved technical need.
  8. REQ-08 The pipeline MUST generate a trace report from requirement to design, code, test and result. Gaps produce warnings on draft requirements and failures on approved requirements at release.
  9. REQ-09 A change to a requirement MUST trigger a change impact check that flags dependent requirements, tests and documents. The PR MUST acknowledge each flagged item.
  10. REQ-10 A requirement MUST be reviewed by its author, an implementer and a verifier before it is approved.
  11. REQ-11 Non-functional requirements SHOULD be selected from the NFR catalogue (EG-003).
  12. REQ-12 Regulatory and security requirements MUST be captured as requirements with the same rules (EG-022, EG-023).
  13. REQ-13 Work items MUST link to a requirement or a defect. Work with neither (tooling, refactoring) MUST state its justification.

Traceability chain

mermaid diagram

Requirement example

id: REQ-FW-0142
title: Dual-bank image staging
statement: The firmware shall stage a received image in the inactive bank without interrupting normal operation.
type: functional
level: firmware
parent: REQ-SYS-0031
verification: test
status: approved
owner: Update team
rationale: Avoids service interruption during updates.

Compliance

Rule Checked by
REQ-03, REQ-04 CI: requirement schema and ID uniqueness check
REQ-06 CI: commit footer check, test naming check
REQ-07, REQ-08 CI: trace report gate on release branches
REQ-09 PR template item and change impact report

Checklist

Tick an item when it is true for your project. Rule IDs point to the detail above.

  • Requirement levels and allocation rules are defined (REQ-01)
  • Each requirement is atomic, unambiguous, feasible, necessary, consistent and verifiable, with one verification method (REQ-02)
  • Requirements are stored as text in the repository with stable REQ-<AREA>-<nnnn> IDs (REQ-03)
  • Each requirement has a rationale, parent, owner and status (REQ-04)
  • Requirements are baselined by tag at each release (REQ-05)
  • IDs are referenced in commit footers, PRs and test names (REQ-06)
  • Every approved requirement is allocated, implemented and verified, and every test traces to a requirement (REQ-07)
  • The pipeline generates a trace report with gap gates (REQ-08)
  • A requirement change triggers a change impact check (REQ-09)
  • Requirements are reviewed by author, implementer and verifier before approval (REQ-10)
  • Non-functional requirements are selected from the NFR catalogue (REQ-11)
  • Regulatory and security requirements are captured as requirements (REQ-12)
  • Work items link to a requirement or defect, or state their justification (REQ-13)

As Markdown. To copy it into an issue, a pull request or a review record:

- [ ] Requirement levels and allocation rules are defined (REQ-01)
- [ ] Each requirement is atomic, unambiguous, feasible, necessary, consistent and verifiable, with one verification method (REQ-02)
- [ ] Requirements are stored as text in the repository with stable `REQ-<AREA>-<nnnn>` IDs (REQ-03)
- [ ] Each requirement has a rationale, parent, owner and status (REQ-04)
- [ ] Requirements are baselined by tag at each release (REQ-05)
- [ ] IDs are referenced in commit footers, PRs and test names (REQ-06)
- [ ] Every approved requirement is allocated, implemented and verified, and every test traces to a requirement (REQ-07)
- [ ] The pipeline generates a trace report with gap gates (REQ-08)
- [ ] A requirement change triggers a change impact check (REQ-09)
- [ ] Requirements are reviewed by author, implementer and verifier before approval (REQ-10)
- [ ] Non-functional requirements are selected from the NFR catalogue (REQ-11)
- [ ] Regulatory and security requirements are captured as requirements (REQ-12)
- [ ] Work items link to a requirement or defect, or state their justification (REQ-13)

Applying to personal projects and AI agents

Personal projects

Starts at the Standard profile (see personal-projects.md). Keep a short docs/requirements/ list with IDs and a one-line verification each, and reference IDs with Refs: in commits. Skip formal levels and three-way review. For a small script, a ‘what it must do’ list in the README is enough.

AI agents

  • Before implementing, find the requirement ID or IDs the task serves and cite them in commits (Refs: REQ-...) and test names (REQ-06).
  • If there is no requirement, say so and ask, or propose one for review (REQ-13).
  • Never edit approved requirements without instruction, and flag the impact on tests and docs (REQ-09).